Economic and Financial Analysis

Investment Cost Calculation

We prepare realistic and detailed investment budgets:

  • Detailed price analysis of main and auxiliary equipment
  • Building, foundation, auxiliary facilities, and site preparation costs
  • Assembly, testing, and commissioning expenses
  • Design, project management, and consulting services
  • Legal permits, licenses, and certification costs
  • Working capital required for the first 3-6 months of operation
  • 10-15% contingency allowance for cost overruns

Operating Cost Analysis

We calculate realistic operating expenses:

  • Supply cost analysis of wheat and other inputs
  • Consumption and cost calculation of electricity, natural gas, and other energy sources
  • Direct and indirect labor costs, social benefits, and training expenses
  • Periodic maintenance, spare parts, and breakdown costs
  • Rent, insurance, tax, office, and administrative expenses
  • Distribution, transportation, sales, and marketing activity costs
TANIS Milling Automation Software | Advanced Control Interface System
TANIS Machine Inc. advanced milling automation software interface displaying real-time production monitoring, flour cleaning differentials, and comprehensive mill control parameters for optimal processing efficiency.

Frequently Asked Questions

Depending on the scope and depth of the feasibility study, it can vary between 4-12 weeks. Preliminary feasibility studies take 3-4 weeks, while comprehensive feasibility studies can take 8-10 weeks.

The cost of a feasibility study is determined based on the project’s scale, complexity, and required depth of analysis. As a general rule, feasibility costs vary between 0.5-1.5% of the total project investment.

Yes, our feasibility studies are prepared in formats that comply with national and international financial institution standards.

Absolutely. We conduct feasibility studies for existing facilities for purposes such as capacity increase, modernization, efficiency improvement, or product diversification.