TANIS Lahore Pakistan Destoner | Grain Cleaning Equipment Installation
TANIS destoner equipment at Lahore Pakistan 300 TPD wheat flour mill featuring advanced stone separation technology. Professional grain cleaning system ensuring pure grain processing for high-quality flour production.

Automation Software and Control Systems for Mill Facilities

In the modern milling sector, software solutions play a key role in achieving efficiency improvements and quality consistency. In the Industry 4.0 era, advanced software systems for managing the complex processes of mill facilities are no longer a luxury but have become a necessity for competitive advantage. As Tanış A.Ş., by combining our over 60 years of milling experience with innovative software solutions, we aim to be a reliable partner in our customers’ digital transformation journey.

Recipe Management and Batch Control Software

Advanced control for product quality and consistency:

ISA-88 Standard: International batch process control standard.

Electronic Recipes: Central recipe database and version control.

Traceability: Comprehensive production records for each batch.

Rapid Product Changeover: Product transitions with minimum waste.

Optimization: Recipe fine-tuning balancing quality and efficiency.

TANIS Lahore Pakistan Plansifter | 300 TPD Wheat Flour Mill Equipment
TANIS plansifter equipment installed at Lahore Pakistan 300 TPD wheat flour mill. Advanced sifting technology ensuring precise flour grading and superior product quality in industrial milling operations.

Frequently Asked Questions

This varies according to your business size, production capacity, and objectives. Basic SCADA and PLC solutions for small facilities, recipe management and quality monitoring for medium-scale facilities, and full MES integration for large integrated facilities are ideal. We can determine your specific needs with free analysis.

Depending on the project scope, it can vary between 2 weeks and 6 months. Basic HMI/SCADA solutions take 4-6 weeks, recipe management 8-10 weeks, and fully integrated MES solutions 4-6 months. We minimize production interruption through phased implementation.