TANIS Grain Silo Construction | Industrial Storage Facility Project
TANIS grain silo construction project featuring large-scale industrial storage facilities with steel structure framework. Professional silo installation for efficient grain storage and handling operations.

Sifter and Classification Systems Capacity Increase

  • Larger sifter surface and advanced designs
  • High-efficiency drive and vibration systems
  • Optimum sifter cloth selection and configuration
  • Balancing sifter loading and distribution
  • Modern sizer and purifier systems integration
  • Potential capacity increase: 20-35%

Cleaning and Tempering Systems Capacity Increase

  • High-capacity cleaning equipment
  • Optimized tempering process and equipment
  • Advanced systems for homogeneous moisture distribution
  • Automatic moisture control and optimization
  • Advanced separator and stone removal systems
  • Potential capacity increase: 30-50%

Conveying and Transfer Systems Capacity Increase

  • High-capacity elevator and conveyor systems
  • Optimum conveying speeds and configuration
  • Redesign of bottleneck-creating transfer points
  • Optimization of pneumatic conveying systems
  • Development of flow regulator and distribution systems
  • Potential capacity increase: 20-40%

Aspiration and Filtration Systems Capacity Increase

  • High-capacity fan and blower systems
  • Advanced filter technologies and increased filtration area
  • Optimum air flow and pressure balances
  • Energy-efficient motor and drive systems
  • Dust collection efficiency optimization
  • Potential capacity increase: 15-30%
Tanis Grain Storage Facility Aerial View - Industrial Silos and Infrastructure
Aerial view of Tanis grain storage facility featuring multiple industrial silos and modern infrastructure. Large-scale grain storage complex with steel silos, conveyor systems, and comprehensive grain handling equipment in rural agricultural setting.

Capacity Increase - Frequently Asked Questions

Our capacity increase projects are planned to minimize production interruption. In most cases, modernization can be achieved without extra production loss by using existing planned downtime and weekend periods. Even for large-scale projects, total downtime duration usually does not exceed 1-2 weeks with a gradual approach. In some cases, new systems can be installed in parallel while maintaining existing production, thus ensuring uninterrupted transition.

The payback period of capacity increase projects varies depending on the increase rate, current market conditions, and optimization level. Generally, basic capacity increase projects pay for themselves in 6-12 months, comprehensive modernization projects in 12-18 months, and large expansion projects in 18-24 months. In our projects, comprehensive ROI calculation is made considering not only capacity increase but also energy efficiency, labor savings, and quality improvements.

Most modern technologies can be integrated into existing systems with appropriate interfaces and adaptation solutions. Especially automation, control systems, and sensor technologies can be adapted to old systems with minimal modifications. In mechanical systems, new equipment can be integrated using special adapter parts and intermediate connections. Before each project, we perform detailed compatibility analysis to determine optimal integration solutions.

We offer capacity increase and modernization services for flour mills, semolina mills, corn processing plants, bulgur production facilities, rice processing plants, and all grain processing systems. We also develop specialized capacity increase solutions for legume processing, seed cleaning, and feed mills. We provide integrated solutions for mixed systems containing equipment from different manufacturers.

Yes, we offer special solutions for facilities with physical space constraints. With strategies such as high-efficiency compact equipment, designs that optimize vertical use, replacement of existing equipment with more efficient versions, and smart layout optimization, we can achieve significant capacity increases even in limited areas. In some cases, minimal expansion or elevation of the existing building to create extra space can also be considered.

In our capacity increase projects, energy efficiency is always one of our priority design criteria. With modern, high-efficiency motors and drive systems, advanced insulation techniques, optimized heat recovery systems, and smart automation solutions, we can reduce energy consumption per ton by 15-25% despite capacity increase. In each project, specific energy consumption (kWh/ton) is tracked and optimized as a performance indicator.

Strategically Increase Your Operation’s Capacity

With Tanış A.Ş.’s expert engineering team and over 60 years of sector experience, strategically and cost-effectively increase your mill operation’s capacity. With our solutions that are much more economical and faster compared to new facility investment, respond to market demands, gain competitive advantage, and increase your profitability.

Whether you are planning a bottleneck elimination-focused improvement, comprehensive modernization, or a large capacity expansion project, we offer customized solutions suitable for your operation’s specific needs and objectives.

Contact us immediately for a free capacity assessment and feasibility study. Our expert engineers will analyze your existing system to determine potential capacity increase and optimum modernization strategies.