TANIS Factory Roller Mill Production | Advanced Milling Equipment Manufacturing
Inside TANIS factory showcasing high-precision roller mill manufacturing. State-of-the-art production facility where advanced milling equipment is engineered and assembled for global grain processing operations.

Our Efficiency Analysis Service Packages

We offer efficiency analysis packages suitable for your operation’s needs and budget:

Quick Efficiency Assessment: 3-5 day rapid screening and priority improvement opportunity identification

Comprehensive Efficiency Analysis and Benchmark: 2-4 week detailed analysis and comparative evaluation

Energy Efficiency Special Analysis Package: Energy usage-focused detailed analysis and saving potential identification

Production Efficiency and OEE Improvement Package: Production process and equipment effectiveness-focused analysis

Waste Reduction and Raw Material Optimization Package: Raw material usage and waste reduction-focused evaluation

Continuous Monitoring and Efficiency Consulting: Long-term performance monitoring and continuous improvement support

Customized Efficiency Analysis Solutions: Analysis services designed according to your operation’s specific needs

Our Support Services After Efficiency Analysis

We continue to be with you after the analysis:

  • Consulting in implementing improvement projects
  • Setup of efficiency monitoring and reporting systems
  • Training and competency development programs
  • Evaluation of implementation results
  • Creating continuous improvement culture
  • Periodic evaluation and updates
  • Long-term efficiency improvement strategies
TANIS South Sudan Maize Mill | Pneumatic Conveying System Technology
TANIS Milling Technologies' advanced pneumatic conveying system installed at South Sudan Maize & Mill facility. Modern grain transportation and processing equipment for efficient maize milling operations.

Depending on the analysis scope, it can vary between 3 days and 4 weeks. Quick assessment takes 3-5 days, while comprehensive analysis can take 2-4 weeks.

Our efficiency analyses affect existing production flow at a minimum level. Most measurements and observations are made under normal production conditions. We work in coordination with operation personnel to prevent production disruptions.

Main indicators include OEE, specific energy consumption, raw material utilization efficiency, waste rates, capacity utilization rate, downtime, labor efficiency, quality performance, and cost structure.

Our improvement recommendations are classified as short, medium, and long-term. Recommendations providing quick wins can generally be implemented within 1-4 weeks, while comprehensive projects can be implemented within 2-6 months.

Unlock Your Mill’s Full Potential

Reveal your mill operation’s hidden performance potential with Tanış A.Ş.’s professional efficiency analysis. With our scientific approach and data-driven methodology, we maximize your profitability by minimizing losses.